Book a demo
Use cases

Simulate every design.
Every supplier. Every depth.

Parsio models each part once. Then every line of its cost becomes a question you can ask, before anyone commits to a price.

Challenge the spec, not the supplier

Every requirement on the drawing has a price. Parsio shows which ones earn it.

BR-2210 · Mounting bracketRev C · 2014
1Bore tolerance ±0.05+€0.84
2Stainless 304+€1.20
3Zinc-nickel coating+€0.46
Over-specified

±0.05 on the bore forces a reaming pass. At ±0.1 it comes straight off the laser.

Per part−€0.84
What if ±0.1, galvanized? €7.40 → €5.78

Know their cost before they quote

A should-cost for every supplier able to make the part, from its own machines and rates.

Should cost by supplierBR-2210 · 12k / yr
SupplierProcessShould cost
IncumbentLaser + press brakeFR €7.40quote
Press shop AProgressive die, 250 tPL €6.10
Stamper BTransfer pressPT €6.45
Job shop CLaser + press brakeFR €7.05
Best capable supplier

A progressive die makes the bracket in one hit. Landed in Lyon, freight and duties in.

vs quote−18%

Buy at the right depth

Parsio costs the chain at every level, so buying it built or buying the parts becomes a number.

GB-40 gearboxbought assembled€182
  • Housing, cast€38
  • Gear set ×3€54
  • Shaft + bearings€27
  • Assembly and test€32
  • Integrator margin€31
Margin stack

The integrator earns €31 on parts it buys in. Buy the gear set and bearings direct, keep them assembling.

Per unit€151
And if the group buys the steel €139 per unit

Merge the parts that were never different

Parsio groups parts by what they physically are, not by how each plant coded them.

  • 6208-2RS
  • BRG 6208 2RS C3
  • Roulement 40x80x18 2RS
  • SKF-6208-2RSH
  • 6208 DDU
  • 6208-2RSR/C3
  • KL-40-80-18
7 references · 3 plants

Deep-groove bearing, 40×80×18

Combined volume: 48,000 a year

Price spread
€2.10€3.85
Merged to one reference, the volume triples and the best price applies everywhere.

Take a price increase apart

Parsio prices the part again at today's indices and shows what the increase can't explain.

From: Supplier · 12 Sep

Price adjustment, cord C-114

Due to rising raw material and energy costs, our prices will increase by 8.0% from 1 October.

Increase, explained+8.0% announced
Copper index +2.4
Energy index +0.7
Labour +0.0
Unexplained +4.9
Unexplained Copper and energy explain 3.1 points. Nothing explains the other 4.9.

Every answer lands in one savings pipeline

Cost engineers build the models, buyers run the scenarios, the CPO steers the total.

Savings pipelineAll families€3.5M
Specs €1.2M
Suppliers €0.9M
Depth €0.4M
Portfolio €0.7M
Market €0.3M
New opportunity

BR-2210 family: relax 2 of 3 requirements across 40 references.

Owner: Engineering€0.4M

Bring one part family. See what your specs cost you.